What Does site acceptance test and commissioning Mean?
Initiate the boot-up procedure for engineering and operator workstations According to the maker’s Guidelines. Press the INIT button on the main controller (controller acquiring indicator on controller entrance panel)The SAT Approach is going to be utilized by the contractor to guide SAT functionality and by the corporation to monitor SAT compl